Projects per year
Search results
-
Active
Construction of a pilot, low-cost, high-seismic performance school building in Nepal
1/01/21 → 31/07/22
Project: Research
B.Sc.(Eng) Lond, Ph.D.(UCL.), C.Math MIMA
BS8 1TR
1/01/21 → 31/07/22
Project: Research