Abstract

For off-grid communities, micro-hydropower continues to provide affordable and reliable electricity access across the world. In Nepal, despite ongoing development of large-scale hydropower projects and the extension of the national grid, there remain many off-grid communities that depend on micro-hydropower plants. Over time, these systems are prone to erosion from sediment in the water, which, together with other degrading mechanical and environmental effects, may lead to reduced reliability and potential failure. Extreme weather and natural disasters can also cause catastrophic failure of the plant and its infrastructure. In such cases, Nepali micro-hydropower companies are best placed to conduct renovation works.
Where renovation is required, the selection of a different turbine type could be beneficial. Recent work has demonstrated the potential of the Turgo turbine for use in Nepal due to several advantageous features. In this paper, a methodology is applied to explore the feasibility of a site for refurbishment considering environmental, social, technical, economic, and legal factors. Subsequently, a series of design and costing activities are used to demonstrate that the Turgo turbine can be implemented. A Turgo turbine design is scaled appropriately and manufactured by a Nepali company. The turbine demonstrated an increase in power generated, from 18 kW for the existing turbine to 32 kW for the newly installed turbine. The potential for Turgo turbines at other sites around Nepal is analysed, demonstrating it could be used to renovate and improve energy production at many sites across the country.
Original languageEnglish
Article numbere230015
JournalJournal of Sustainability Research
Volume5
Issue number4
DOIs
Publication statusPublished - 22 Nov 2023

Bibliographical note

Funding Information:
From a social and economic perspective, the project was implemented using the funding from EnergizeNepal and with contributions of labour from beneficiaries. The provision of funding meant that a local financial contribution was not required. Consequently, the community were keen to proceed with the project. Without grant funding, the community would have been responsible for the complete cost, perhaps with support from the Alternative Energy Promotion Centre and local government. Ideally, income from plant tariffs can be saved for the costs of repair and maintenance. In practice, challenges associated with tariff collection means that this does not happen universally [32]. Whilst the focus of the project team was the installation of the turbine, as part of the project implementation, a number of suggestions were made to the management committee relating to financial management. It was emphasised to the community that the frequency of tariff collection should be increased, income and expenditure should be recorded, and regular meetings of the management committee should be held. The costing method predicted a cost for the electro-mechanical components of $9527. In practice, the actual cost was lower at $7812. Due to the relatively small dataset (n = 28) used to predict cost and the one-off nature of the Turgo turbine construction, no major conclusions regarding the cost of the Turgo turbine can be drawn. However, the relatively small difference (~20%) suggests that the costing method offered a reasonable estimate. The expression for estimating renovation cost (Equation 5) should be validated by comparison with other hydropower site renovations in Nepal.

Funding Information:
The study was funded by an EPSRC Impact Acceleration Account and through Energize Nepal, project reference number ENEP-RENP-17-01.

Publisher Copyright:
© 2023 by the author(s).

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • Micro-hydropower
  • Turgo turbine
  • site renovation