Skip to main navigation Skip to search Skip to main content

Aspirations undone: hydropower and the (re) shaping of livelihood pathways in Northern Laos

  • Diana Suhardiman*
  • , Jonathan Rigg
  • *Corresponding author for this work

Research output: Contribution to journal › Article (Academic Journal) › peer-review

15 Citations (Scopus)

Abstract

This paper looks at how local livelihoods and to a certain extent their transitions are embedded in, and in thrall to, power relations at higher levels. Placing the (re)shaping of livelihood pathways within the context of top-down hydropower planning, it shows how the latter predetermines farm households’ current farming strategies and future livelihood pathways. Taking two villages along the Mekong River, both of which are to be impacted by the planned Pak Beng hydropower dam in Pak Beng district, Oudomxay province, the paper illustrates how the pathways that rural livelihoods are taking in northern Laos are being shaped by decisions and processes embedded in national and regional exigencies. We argue that top-down approaches in hydropower planning, as manifested in the current institutional vacuum to formally deal with resettlement and compensation issues at the village level result in village authorities’ and potentially affected villagers’ inability to strategically convey and negotiate their views and concerns. Moreover, we reveal how it is the specter of change which drives livelihood adaptation, not change itself, thus illustrating how the defined compensation rules and procedures (re)shape farm households’ farming strategies and future livelihood pathways even prior to the construction of the hydropower dam.

Original languageEnglish
Pages (from-to)963-973
Number of pages11
JournalAgriculture and Human Values
Volume38
Issue number4
Early online date5 Mar 2021
DOIs
Publication statusPublished - 1 Dec 2021

Bibliographical note

Funding Information:
This work was undertaken as part of, and funded by, the CGIAR Research Program on Policies, Institutions and Markets (PIM) led by the International Food Policy Research Institute (IFPRI) and the Stockholm Environmental Institute (SEI) SUMERNET research project on “Strengthening pathways for rights-based approaches in Mekong hydropower” led by the International Water Management Institute (IWMI). The opinions expressed here belong to the authors and do not necessarily reflect those of PIM, IFPRI, or CGIAR. The authors would like to thank Oulavanh Keovilignavong for his support of initial field data collection in both villages in February 2020, NAFRI, PAFO Oudomxay, DAFO Pak Beng for their support and collaboration throughout the (field) research.

Funding Information:
Following the signing of the MoU between the GoL and Datang, the signing of the project development agreement between Datang and the MEM, and the completion of technical, socio-environmental assessment studies by KHIDRI, the Provincial Resettlement and Compensation Committee (PRCC) was set up in November 2016. The committee is responsible to lead the overall process of resettlement and compensation, including reviewing the compensation rates, rules and procedures proposed by the company, conducting asset registration and measurement, and carrying out actual resettlement and compensation payment. In Oudomxay province, the committee was led by the Provincial Governor and coordinated by the Provincial Energy and Mines Office (PEMO) as the lead implementing agency and supported by Provincial Home Affairs (PMA), Provincial Agriculture and Forestry Office (PAFO), and Provincial Natural Resources and Environment (PoNRE). At the district level, the PRCC is equipped with a Secretariat led by the Head of the District, coordinated by District Energy and Mines Office (DEMO) and supported by District Agriculture and Forestry Office (DAFO) and District Natural Resources and Environment (DoNRE). Working together with the company, DoNRE assessed and measured the extent of the farmland (upland fields, lowland paddy fields, home gardens) and residential land impacted by the dam project. In a similar manner, DAFO assessed the estimated impacts in terms of agricultural production (crop production and livestock).

Publisher Copyright:
© 2021, The Author(s), under exclusive licence to Springer Nature B.V.

Keywords

  • Compensation
  • Farming strategies
  • Hydropower planning
  • Laos
  • Livelihood pathways
  • Resettlement

Fingerprint

Dive into the research topics of 'Aspirations undone: hydropower and the (re) shaping of livelihood pathways in Northern Laos'. Together they form a unique fingerprint.

Cite this