Abstract
The authors regret the need of a corrigendum with the following changes. The authors would like to apologise for any inconvenience caused. Corrigendum Section 1. Introduction: The second sentence of the last paragraph was changed to. “Built on previous publication [46], the present study further investigated the weldability and mechanical properties of PG4 FBRWs.” [46] Micheletto, A., Cookson, J., Pang, Y., Chen, B., & Mutton, P. (2021). The structural integrity of flash-butt welded premium rail steel–Evaluation of strength, microstructure and defects. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 235(8), 1006–1012. Corrigendum Section 3.1. Micro-structural characterisation Fig. 4 (b) needs to add a reference; therefore, the caption was changed to: “Fig. 4. (a) Variations of longitudinal hardness measured from the rail head, web, and foot, (b) a cross-section of the flash-butt rail weld [46], and (c) temperature profile during cooling.” [46] Micheletto, A., Cookson, J., Pang, Y., Chen, B., & Mutton, P. (2021). The structural integrity of flash-butt welded premium rail steel–Evaluation of strength, microstructure and defects. Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 235(8), 1006–1012.
Original language | English |
---|---|
Article number | 106929 |
Journal | Engineering Failure Analysis |
Volume | 143 |
DOIs |
|
Publication status | Published - Jan 2023 |
Bibliographical note
Publisher Copyright:© 2022 Elsevier Ltd
Fingerprint
Dive into the research topics of 'Corrigendum to “Experimental investigation on microstructures and mechanical properties of PG4 flash-butt rail welds” [Eng. Fail. Anal. 141 (2022) 106650] (Engineering Failure Analysis (2022) 141, (S1350630722006227), (10.1016/j.engfailanal.2022.106650))'. Together they form a unique fingerprint.Equipment
-
HPC (High Performance Computing) and HTC (High Throughput Computing) Facilities
Alam, S. R. (Manager), Williams, D. A. G. (Manager), Eccleston, P. E. (Manager) & Greene, D. (Manager)
Facility/equipment: Facility