Economic production quantity model considering warm-up period in a cleaner production environment

Amir Hossein Nobil, Sunil Tiwari*, Fatemeh Tajik

*Corresponding author for this work

    Research output: Contribution to journalArticle (Academic Journal)peer-review

    22 Citations (Scopus)

    Abstract

    Currently, the primary objective of every manufacturing organization is in customers’ satisfaction and system cost reduction while keeping in mind both production quantity (economic issues) and environmental issues (sustainability). This study investigates the effects of machine warm-up period on an imperfect production process with rework. In this case, the maintenance process is intended to maximize the efficiency and effectiveness of the production machine. In this manufacturing system, it assumed that after the setup time, the machine starts at the lower rate than the regular production process, commonly called as warm-up period. The warm-up period will increase the useful life of the machine. On the other hand, the machine's defects that occur during this warm-up period are identified and repaired before the regular production starts. Also, this warm-up period reduces waste as it improves machine performance; resulting in the decrease of scrapped items that makes the process friendly for the environment. The purpose of this proposed model is to determine the optimum value of production quantity to minimize the total costs by considering the warm-up period and set-up time. Finally, numerical experiments have been conducted to validate the efficacy of the model as well as to obtain some managerial insights.

    Original languageEnglish
    Pages (from-to)4547-4560
    JournalInternational Journal of Production Research
    Volume57
    Issue number14
    DOIs
    Publication statusPublished - 18 Jul 2019

    Bibliographical note

    Publisher Copyright:
    © 2018, © 2018 Informa UK Limited, trading as Taylor & Francis Group.

    Keywords

    • cleaner production system
    • economic production quantity
    • imperfect items
    • maintenance activity
    • warm-up period