Skip to main navigation Skip to search Skip to main content

Impact of uncertain demand and lead-time reduction on two-echelon supply chain

  • Sumon Sarkar
  • , Sunil Tiwari*
  • , B. C. Giri
  • *Corresponding author for this work

    Research output: Contribution to journal › Article (Academic Journal) › peer-review

    20 Citations (Scopus)

    Abstract

    This paper develops a continuous-review vendor-buyer supply chain (SC) model wherein the lead-time (taken as replenished) is considered as a factor affected upon by the time stamp required for setup and production followed by transportation. Here, the production time indicates the interaction between the lot-size and lead-time. Assuming the existence of an opportunity with the buyer of reducing the replenishment lead-time. The buyer receives normally distributed stochastic lead-time demands from its customers. Due to the stochastic nature of lead-time demand, shortages may arise at the buyer’s side which is fully backlogged. We presume imperfection production at the vendor’s end, which leads to the generation of a certain ratio/percentage of defective products, which results in additional warranty costs for the vendor. This study intends to uncover the best policy that minimizes the system’s total expected cost. A solution algorithm with some lemmas is provided which helped in finding the optimal solution and to prove the uniqueness of the solutions. Findings demonstrate that a reduction in lead-time can effectively lower safety stock as well as the total cost.

    Original languageEnglish
    Pages (from-to)2027-2055
    JournalAnnals of Operations Research
    Volume315
    Issue number2
    DOIs
    Publication statusPublished - 1 Aug 2022

    Bibliographical note

    Funding Information:
    We thank the editor-in-chief and anonymous reviewers for their constructive comments. The work of first author is supported by JU-RUSA 2.0 Doctoral Scholarship, Jadavpur University, Kolkata, India under Ref. No. R-11/197/2019. The second author author would like to express his gratitude to NRF Singapore (Grant NRF-RSS2016-004) for financial assistance to carry out this research work.

    Publisher Copyright:
    © 2021, The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature.

    Keywords

    • Demand uncertainty
    • Investment
    • Lead-time reduction
    • Safety stock
    • Two-echelon supply chain

    Fingerprint

    Dive into the research topics of 'Impact of uncertain demand and lead-time reduction on two-echelon supply chain'. Together they form a unique fingerprint.

    Cite this